Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Oct 24, 2007     Pedal access hatch - (4.8 hours)       Category: Fuselage
Today, I finished drilling the screw holes in the cover plate and attachment ring to #19 size, then drilled the ring for the nutplates. Next, I countersunk all the #30 holes in the attachment ring.

Then, it was time to make the big cut -- the hole in the fuselage. I simply laid on the floor next to the fuselage with a Dremel tool and trimmed close to the lines. As always, it feels odd to hack a big hole in a nice, perfect skin. Once I'd cut a rough hole, I used a notching tool, a 2" drum-sander, and various files and sandpaper to finish off the edges of the hole.

I dimpled the cover plate and attachment ring, and as I expected, they both curled quite significantly in the process. I spent about 30 minutes flattening them by hand. (I've found this to be the best way to do this. There is no tool or process I know of that allows the required level of finesse). I clecoed the attachment ring to the fuselage skin and fine-tuned the fit of the cover plate. It looks really good!

Finally, I primed the attachment ring, the inside of the fuselage skin along the line of rivet holes, and the inside of the cover plate.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.